Sign In | Join Free | My gimpguru.org
China Xian TianRui Petroleum Machinery Equipment Co., Ltd. logo
Xian TianRui Petroleum Machinery Equipment Co., Ltd.
Verified Supplier

1 Years

Home > Mud Cleaning System >

HDD500GPM High-Performance Solids Control System – Five-Stage Purification for Superior Drilling Operations

Xian TianRui Petroleum Machinery Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

HDD500GPM High-Performance Solids Control System – Five-Stage Purification for Superior Drilling Operations

  • 1
  • 2
  • 3

Brand Name : TR Solids Control

Model Number : HDD500GPM

Certification : API Q1,ISO9001

Place of Origin : Xi'an,China

MOQ : 1

Price : USD 275-45800 or Negotiable

Payment Terms : L/C,T/T

Capacity : 500GPM

Shale Shaker : TRZA585

Mud Cleaner : TRJQ250*1S-100*8N

Centrifuge Pump : TRSB6*5-12j

Jet Mud Mixer : TRSLH150-35

Mud Agitator : TRJBQ7.5

Gross Power : 130kw

Total Volume : 15m³

Contact Now

500GPM HDD High-Performance Solids Control System Five-Stage Purification for Superior Drilling Operations

Product Description

The 500GPM HDD High-Performance Solids Control System is a complete mud circulation and purification solution engineered for drilling rigs ranging from 2000m to 9000m depth, including offshore and jack-up platforms. Designed with five-stage solids removal technology, the system ensures optimal drilling fluid properties, improves drilling efficiency, and reduces environmental impact.

The system integrates shale shakers, vacuum degasser, desander, desilter, decanter centrifuge, mud tanks, agitators, mud guns, pumps, and auxiliary equipment into a fully functional unit. Its modular design allows customization for oil & gas rigs (250HP3000HP) and HDD projects, delivering a cost-efficient and environmentally responsible solids control solution.

Features & Benefits

Five-Stage Purification Efficiently removes drilling cuttings and fine solids to maintain stable mud properties.

Wide Drilling Depth Range Supports rigs from 2000m to 9000m, onshore and offshore.

Environmental Protection Reduces drilling waste, minimizes mud loss, and promotes fluid recycling.

High Processing Capacity 500GPM flow rate ensures continuous support for demanding drilling operations.

Customizable Design Flexible configuration to match rig specifications and project requirements.


Main Scheme of Our Drilling Waste Management


Rig

ZJ70

ZJ50

ZJ40

ZJ30

ZJ20

ZJ10

Mud Tank

≥270m³/h

≥200m³/h

≥180m³/h

≥160m³/h

≥160m³/h

≥80m³/h

Storing Tank

≥160m³/h

≥120m³/h

≥80m³/h

≥80m³/h

×

×

Shale Shaker

≥360m³/h

≥280m³/h

≥240m³/h

≥180m³/h

≥140m³/h

≥80m³/h

Vacuum Degasser

360m³/h

300m³/h

240m³/h

×

Desander

≥320m³/h

≥240m³/h

≥200m³/h

≥180m³/h

≥120m³/h

Desilter

≥320m³/h

≥240m³/h

≥200m³/h

×

×

Middle Speed Centrifuge

50m³/h

50m³/h

40m³/h

×

High Speed Centrifuge

40m³/h

40m³/h

×

×

×

Jet Mud Mixer

≥300m³/h

≥240m³/h

≥200m³/h

≥180m³/h

≥120m³/h

≥80m³/h

Shear Pump

≥120m³/h

≥120m³/h

≥120m³/h

≥120m³/h

≥100m³/h

×

Charging Pump

≥240m³/h

≥200m³/h

≥180m³/h

≥150m³/h

≥100m³/h

×

Technical Advantages

Integrated Solids Removal Units Shale shaker, vacuum degasser, desander, desilter, and centrifuge for complete purification.

Heavy-Duty Mud Tanks Classified into trip, circulation, weighting, mixing, and storage tanks for efficient mud management.

Efficient Pumping System Centrifugal pumps configured as desander, desilter, trip, or mixing pumps.

Energy-Saving Operation Optimized power distribution reduces energy consumption while ensuring stable performance.

Durable Construction Built with wear-resistant materials to handle abrasive drilling fluids and harsh field conditions.

Applications

Oil & Gas Drilling Rigs (2000m9000m)

Offshore Platforms & Jack-Up Rigs

Horizontal Directional Drilling (HDD) Projects

Mining & Geothermal Drilling

Tunneling & Piling Construction

Advantages & Services

Turnkey System Supply Complete solids control package with tanks, pumps, agitators, and auxiliary equipment.

OEM & Custom Design Tailored to specific rig horsepower and project requirements.

Quality Assurance Manufactured in compliance with API and ISO standards.

Global Support & Logistics Secure packaging, fast delivery, and worldwide service network.

After-Sales Service Technical training, and spare parts availability.

Why Construction Professionals Choose 500GPM HDD Solids Control System?

Comprehensive Solution – Integrates solids removal, mud mixing, and storage into one system.

Stable & Reliable – Proven performance in both oil-based and water-based mud systems.

Cost-Efficient Operation – Reduces mud cost and waste disposal expenses.

Environmentally Responsible – Supports green drilling practices with efficient mud recycling.

Trusted Expertise – Manufactured by an industry leader with extensive experience in solids control and drilling waste management.

About TR SolidsControl

TR SolidsControl is a professional manufacturer of drilling fluid equipment, supplying advanced solids control solutions for oil and gas, trenchless, and geothermal industries worldwide. Our commitment to innovation and quality ensures high-performance products and reliable service.


HDD500GPM High-Performance Solids Control System – Five-Stage Purification for Superior Drilling Operations


Product Tags:

HDD500GPM mud cleaning system

      

five-stage purification drilling system

      

high-performance solids control system

      
Quality HDD500GPM High-Performance Solids Control System – Five-Stage Purification for Superior Drilling Operations wholesale

HDD500GPM High-Performance Solids Control System – Five-Stage Purification for Superior Drilling Operations Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xian TianRui Petroleum Machinery Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)